Home | Products | Samples | Orders | Catalogs

Eldon James - Inventory        Tel 970-667-2728


Inventory row section

Eldon James maintains approximately 3 million parts in inventory ready for shipment. Our standard production time for back ordered items is 2 weeks. Stainless Steel fittings and antimicrobial protected AG fittings have lead times of 3-4 weeks to accommodate additional manufacturing processes.


 

Parts are boxed after inspection, and stamped with a production date and inspector's signature. All parts in a container are from the same production run and are labeled with the job number. In addition, Natural Materials parts
are labeled with a material lot number that is entered on lot traceability certificates.

   

 
5,000 fittings boxed & ready for stock  
«Back     Next»
 
Facilities | Design and Engineering | Production | Quality Control | Shipping