| Eldon James - Inventory Tel 970-667-2728 |
![]() Inventory row section |
Eldon James maintains approximately 3 million parts in inventory ready for shipment.
Our standard production time for back ordered items is 2 weeks. Stainless Steel
fittings and antimicrobial protected AG fittings have lead times of 3-4 weeks
to accommodate additional manufacturing processes. | ||||
![]() |
Parts are boxed after inspection, and stamped with a production date and inspector's
signature. All parts in a container are from the same production run and are labeled
with the job number. In addition, Natural Materials parts | ||||
| 5,000 fittings boxed & ready for stock | |||||